F1 Rocket Hangar

Speed...Speed and Looks...Looks and Speed!

  • The Airplane Builder
  • F1 Rocket Info
    • F1 Rocket Specs
    • F1 Rocket Build Tips
  • F1 Build Log
  • About
    • Disclosure
  • Stewart 51 Hangar
  • Resources
  • Ask Mike | Contact

HS-704 nose rib riveting – Revisited

March 30, 2020 by admin Leave a Comment

Continuing the saga from yesterday, today I cannot proceed with any more horizontal stabilizer riveting until I revisit and finish riveting in the HS-704 nose ribs. Again!

So I got the nose ribs clecoed in place (on the correct side this time!) and then proceeded with riveting them in. Below is the rivet gun setup that I used. This worked REALLY well. I had no difficulty shooting these rivets today and it actually went very smoothly and with good results. In the past I used the double offset rivet set. This caused me nothing but grief. I got it to work, but it’s not nearly as controlled as with using this 5 1/2 inch extended rivet set.

Below is the finished results. I’m happy with that!

And the HS-704 nose ribs now fit. One step forward, two steps back.

Now that this little screw-up is rectified, I can now get back on track with finishing up the riveting of the upper surface of the horizontal stabilizer, and then back onto the wing spars. Stay tuned for more in the coming days.

Today’s playlist was the Plane Building Playlist.

Please comment. I love to hear from my readers.  Thanks again for coming along for this ride, you make my work worthwhile.

Filed Under: Empennage, Horizontal Stabilizer Tagged With: Empennage, Horizontal Stabilizer, Screw-ups

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Profile Photo 1 Hello - My name is Mike and I'm a true believer that if you can imagine something, it's just a matter of bringing it into reality.

Categories

  • Empennage
    • Elevators
      • Left Elevator
        • Trim Tab
      • Right Elevator
    • Horizontal Stabilizer
    • Rudder
    • Vertical Fin
  • In My Travels
  • Primer
  • Tools
  • Uncategorized
  • Wings
    • Ailerons
    • F-404 Bulkhead
    • Flaps
    • Fuel Tanks
    • Leading Edge
    • Left Wing
    • Rear Wing Spar
    • Right Wing
  • Workshop

Tags

Ailerons Anti-Hang Up Guide Countersink Dimpling Doubler E-606-PP Elevator Empennage F-404 Bulkhead Flaps Fuel Sender Fuel Tank Hinge Horizontal Stabilizer HS-3101 HS-3201 Jigs Leading Edge Main Squeeze Mods Oshkosh priming rear spar Rib spacing Riveting Rudder Rudder Brace Horn Screw-ups Spar spreader bars Stiffener Tools Trap Door TrimTab Vertical Fin VS-001 VS-002 VS-803PP VS-808PP W-407B W-407C W-407D Wing Wings Workshop

Copyright © 2025 · Beautiful Pro Theme on Genesis Framework · WordPress · Log in