Today I started drilling the skins of the Horizontal Stabilizer (HS). The skin comes predrilled but the holes all need to be drilled out to the final size (#40). Also the forward spar, between the root rib (E-705) and main rib (E-708), is not drilled. The skin is pre-drilled in this area, but not the […]
HS-3201 Doubler Cutting
Today I ventured into cutting the HS-3201 horizontal stabilizer forward spar doubler. Drilling I started by securely clamping the doubler plate onto the drill press. I located the center of the holes to be cut. Once the holes were located, I used larger drill bit to cut the holes to size. It was a toss-up […]
Horizontal Stabilizer Spar Doubler Layout
Today I continued work on the horizontal stabilizer rear spar doubler (HS-3101). In the picture below I have the HS-3101 doubler laid in place on the rear spar. Other things to note in the picture are the plexi-glass templates I used for making the additional Rocket doublers and in the background is part of the […]