Not a lot of pictures today but there was lots of elbow grease used in the prep of the VS-808PP vertical fin rear spar doubler. Lots of filing, sanding and rubbing with emery cloth and scotchbrite while I break the edges and remove any tooling marks on the VS-808PP spar doubler. Please comment, I love to […]
Vertical Fin Assembly in a Basement Apartment
Today I am progressing with the work on the vertical fin assembly. In the picture shown below I have all the vertical fin parts laid out on the table. These are all RV-8 parts except for the 2 forked doublers which you will see in greater detail in the following photos. As mentioned in previous […]
Vertical Fin – Forward Spar Doubler Drilling
Continuing with the layout of the vertical fin forward spar doublers, shown below is the VS-002 doubler clamped in place, on the rear side forward spar. What isn’t shown here is the marks I made on the bottom (where the clamps are) to help keep the alignment when I transferred this doubler from the front […]
Vertical Fin Construction Started
This evening I started construction on the vertical fin assembly. Since I’m starting with a standard RV-8 empennage kit, I’m going to be adding a few structural mods to “Rocketize” these parts. Essentially, these mods are similar to the F1 EVO tail. Talk about making-it-work! What a workspace this is…haha! I just moved across the […]